
Merchandise description:
Product Description
For filling carbonated drink is made up of washing, filling and capping mWith total automation, suitable for filling carbonated consume into polyester bottles And PET bottles. It can be employed for all sorts of bottles. The bottleneck blocking can make The procedure of shifting bottles effortlessly by only adjusting the height of conveyor chain.
The filling procedure adopts the micro-strain technology, Which makes filling approach more quickly and far more stable
Primary features
| Design (CGFB) | eight-eight-3 | 16-12-6 | 18-eighteen-6 | 24-24-8 | 32-32-ten | forty-forty-12 | 50-fifty-twelve | sixty-sixty-fifteen |
| Washing head | 8 | 12 | 18 | 24 | 32 | 40 | 50 | 60 |
| Filling head | eight | twelve | eighteen | 24 | 32 | 40 | fifty | 60 |
| Capping head | 3 | 6 | 86 | eight | ten | 12 | 12 | 15 |
| Potential (500ml) | 2000bph | 3000bph | 6000bph | 10000bph | 13000bph | 16000bph | 20000bph | 24000bph |
| Voltage | 380V/50Hz 380V/60Hz, 380V/50Hz, 220V/60Hz | |||||||
| Total dimensions L*W*H | 2000*1500*2200mm | 2200*1600*2200mm | 2500*1750*2200mm | 2950*2150*2200mm | 3720*2800*2200mm | 4180*3200*2200mm | 4720*3350*2750mm | 6000*5450*2750mm |
Gasoline&beverage mixing equipment
one tank
| Potential(kg/h) | QHS-1500 | QHS-2500 | QHS-5000 | |
| Mixing ratio assortment broad(water:sugar) | 3:one-10:one | |||
| Gasoline include amount (CO2H2O volume ratio) | >2.six | |||
| Chilly cooling h2o entrance temperature(ºC) | three-five | |||
| Pre-carbonization tank syrup tank working pressure (Mpa) | .05-.08 | |||
| Conserving tank operating force (Mpa) | .two-.5 | |||
| Electricity(kw) | one.5kw | two.42kw | five.9kw | |
| General dimension(mm) | 1200*a thousand *1800mm | 1500*a thousand *2000mm | 3000*2000 *3000mm | |
| Weight(kg) | 600kg | 1000kg | 3000kg | |
Auxiliary equipment
entire equipment photos:
Manufacturing line technological innovation stream:
Our workshop
one. Cost interval of validity: 60days
two. Payment
thirty% deposit towards the deal by T/T ought to be paid before the get
70% equilibrium should be paid off by T/T soon after inspection before delivery
3. Shipping and delivery time
thirty times following received the down payment
four. Training
Against the requests of the Customer, the Seller’s technician could teach the Buyer’s operators in the Buyer’s manufacturing facility in the intervals of installing & altering
5. Set up and adjustment
The Consumer ought to make a reservation in progress ahead of shipping of the devices
The Purchaser should spend for the engineer’s visa application expense, round air tickets, foods & board ahead of his departure And spend USD 80/day to engineer.
six. Assure
1 year
Competitive Benefits
Well and Substantial High quality Manage ,
Prompt Supply ,extended term tests just before delivery
improve new technology all time
CZPTer’s Design and style and Symbol are Welcome ,
Competitive Charges ,
Earth-pleasant Items ,
In a Selection of Layout ,
Small Buy Acceptable ,
ODM Approved ,
OEM Approved .
High quality: global brand electric power and excellent content
Our devices are employing planet popular model ingredient.
MITSUBISH PLC variable-frequency governor and OMRON optical change form Japan.
